Phase Status
The three phase statuses and what each one allows.
A testing phase moves through three statuses. Its status determines what can be done to it.
Drafted
Fields can be edited, testers can be assigned or unassigned, test cases can be managed, and — if regression is toggled on — regression cases can be managed too. A phase is built here before it goes live.
Active
Completed
Testing is finished and the phase is locked. Results are viewable and reports can be downloaded. See View Results.