Phase Status

The three phase statuses and what each one allows.


A testing phase moves through three statuses. Its status determines what can be done to it.

  1. Drafted

    Fields can be edited, testers can be assigned or unassigned, test cases can be managed, and — if regression is toggled on — regression cases can be managed too. A phase is built here before it goes live.

  2. Active

    Testers can see the phase and conduct testing. Managers can still edit it — add, edit and reorder test cases, add testers, move the end date and turn regression tests on or off. Deleting cases, removing testers and changing the start date need you to cancel it, which returns it to Drafted.

  3. Completed

    Testing is finished and the phase is locked. Results are viewable and reports can be downloaded. See View Results.